In its commitment to the environment and the fight against climate change, TORSA develops, produces and designs renewable energy facilities, wind and photovoltaic parks, nationally and internationally.

Avoided Emissions: 3,000 t CO2/year. WIND FARM CERROS PELAOS

Commissioned: 2013 Location: Padul (Granada) Capacity: 3 MW Wind Turbines: 2 Production: 7 GWh/year Avoided Emissions: 3,000 tons of CO2 per yea

Avoided Emissions: 1,500t CO2/year. WIND FARM SAN JOSÉ

Commissioned: 2013 Location: Huéneja (Granada) Capacity: 1.5 MW Wind Turbines: 1 Production: 3.5 GWh/year Avoided Emissions: 1,500 tons of CO2 per year.

Avoided emissions: 122,000 t CO2/year. CARDONAL, LOS CERRILLOS AND MANANTIALES WIND FARMS

Commissioning: 2023 Location: Litueche (VI Region, Chile) Power: 104.5 MW Wind turbines: 19 Production: 278 GWh/year Avoided emissions: 122,000 t CO2/year

Avoided emissions: 8,000 t CO2/year. GUADIALÍN PHOTOVOLTAIC SOLAR FARM

Commissioning: 2007 Location: Belmez (Córdoba) Power: 10MW Production: 19 GWh/year Avoided emissions: 8,000 t CO2/year

Avoided emissions: 48,000 t CO2/year. JEREZ WIND FARM

Commissioning: 2008 Location: Jerez (Cádiz) Power: 42.5 MW Wind turbines: 22 Production: 110 GWh/year Avoided emissions: 48,000 t CO2/year

Avoided emissions: 32,000 t CO2/year. EL PINO WIND FARM

Commissioning: 2006 Location: Los Barrios (Cádiz) Power: 24.6 MW Wind turbines: 11 Production: 73 GWh/year Avoided emissions: 32,000 t CO2/year

Emissions avoided: 55,000t CO2/year. EL PEDREGOSO WIND FARM

EL PEDREGOSO WIND FARM Commissioning: 2006 Location: Tarifa (Cádiz) Power: 45 MW Wind turbines: 27 Production: 126 GWh/year Emissions avoided: 55,000t CO2/year