The El Pedregoso Wind Farm, located in Tarifa (Cádiz) and commissioned in 2006, has a capacity of 45 MW distributed across 27 wind turbines. This project generates approximately 126 GWh annually, preventing the emission of 55,000 tonnes of CO₂ each year.

Key Facts

  • Commissioning: 2006
  • Location: Tarifa (Cádiz)
  • Capacity: 45 MW
  • Wind Turbines: 27
  • Production: 126 GWh/year
  • Emissions Avoided: 55,000 t CO₂/year